The short answer
A summer shutdown is a good time for external work on a factory or warehouse, because the yard is quiet and the loading doors are free. Most commercial cladding resprays take three to seven days on site, so the work can often fit inside a one or two week shutdown if the survey and colour are agreed well beforehand.
Why a shutdown suits external work
Most cladding and roof work can be done with the building open, and our guide to staying open during a respray explains how. Some sites are harder to work around. A busy loading yard, a production line that cannot have its doors held open, a reception that customers use all day or a car park packed against the wall all mean the crew works in shorter windows around you.
When the site closes for a week or two in the summer, those limits go. The yard is clear and the access equipment can sit wherever it is needed. The shutters and loading doors can be done one after another. The weather helps as well. Coatings need dry surfaces and steel above the manufacturer’s minimum temperature, and high summer usually gives the longest run of suitable days.
What can go into a shutdown
Any of these can be planned into the quiet weeks, on their own or together.
- A full cladding respray, elevation by elevation
- Roller shutters, loading doors and personnel doors, which are simpler to spray when nobody needs them open
- Cut edge corrosion treatment, leak repairs and roof coating
- Gutter clearing, repair, lining or replacement
- A full external clean of the walls, rooflights and gutters
- Internal spraying of roof sheets and walls
Everything does not have to happen in the shutdown. The jobs that get in the way of the site go into the quiet weeks, and anything that can be done with the building open is done before or after.
Working back from the date
A shutdown date is fixed, so the planning works backwards from it. The survey comes first, because it sets the scope and the timescale. The colour, the written price, the access plan and the parking all follow from it, and all of them need settling before the first day of the shutdown.
- Give us the shutdown dates when you first get in touch
- Book the survey early enough to agree the scope and the colour well ahead
- Have any brand colour references ready, and check whether your lease or business park has rules on colour
- Agree which parts of the yard, car park and building the crew can use
- Decide what has to be finished inside the shutdown and what can follow
Our guide to choosing a cladding colour helps if the colour is still open.
When the job is longer than the shutdown
A large building with several elevations and a roof can take longer than a one week shutdown. In that case the work is split. The parts that need the site empty, such as the loading doors or the wall beside the busiest bay, go into the shutdown, and the rest is done in the weeks either side with the building open, using evenings and weekends where they help.
Weather can still stop work in summer. Spraying pauses for rain and strong wind, and we build an allowance into the timescale. If the shutdown has no spare days in it, say so at the survey, so the most important elevations are done first.
Safety on a quiet site
An empty site still has to be run safely. The crew is directly employed and trained to IPAF, CSCS and SMSTS, and CladCoat is CHAS and SafeContractor accredited. Roof work is planned from safe access with fragile rooflights protected. If your own maintenance team or other contractors are on site during the shutdown, we agree in advance who is working where, so nobody is below the spraying or the access equipment.
What it costs
Shutdown work is priced the same way as any other job, from a free survey, on the area, the condition, the access and the masking. A clear yard can need less protection than a busy one. If the dates mean evening or weekend working, that is set out in the quote before anything is booked. Our respray or replace guide covers what else moves a price.